Fixes on Project Plan 365 for Mac
Version History
20.65 | December 1 2020 |
- Fixed issue with store app crashing when trying to open a file from Drive 365
- Fixed issue with app crashing when trying to use “Save as” on Mojave (10.14.6)
- Fixed issue when restoring the subscription without having a subscription
- Fixed issues with “Help” buttons not redirecting to the correct articles
- Fixed issue with dashboard not opening due to deleted files
- Fixed issue with "Change Working Time" dialog not being modal
- Fixed issues with grid editing in "Gantt Chart" and "Resource Sheet" views
- Fixed issue with not being able to enter in edit mode in "Change Working Time" exception grid by mouse click
- Fixed issue with app crashing when opening "Options" dialog from "Change Working Time" dialog
- Fixed issue with being able to change views from the app menu when in collaboration mode
- Fixed issue with vertical scroll position not being remembered in "Gantt Chart" view
- Fixed issue with "Unlink" functionality for multiple tasks
- Fixed issue with "Critical Path" links color in "Gantt Chart" view
20.56 | October 5 2020 |
- Fixed issue with notes icon not disappearing if the note does not have text
- Fixed issue with date picker closing every time the hour is changed
- Fixed issue with app crashing when generating customized reports
- Fixed issue with "Work Variance" field not being calculated correctly
- Fixed issue with empty column in "Cost rate" table in "Cost" tab from "Resource Info" dialog
- Fixed issue with document not being closed using keyboard shortcuts
- Fixed issue with Task 0 being changed on save/reopen and when entering in Collaboration mode
20.45 | August 10 2020 |
- Fixed issue with resource names appearing overlapped when the content alignment of the cell is set to center or right
- Fixed issue with new added resource appearing with wrong ID after using the “Undo” option
- Fixed issue with app crashing when using A0 paper size and Fit to 2 pages tall and 1 wide
- Fixed issue with creating a loop of opened dialogs (Options->Change Working time->Options->Change working time).
- Fixed issue with Budget Report crashing on particular files
- Fixed issue with Project Name changing after save
20.39 | July 14 2020 |
- Fixed issue with “Reset” button not working correctly in “Bar” dialog
- Fixed issue with saving files taking very long
- Fixed issue with Cost field from “Resource Information” dialog being editable
- Fixed issue with deleting multiple tasks not working
- Fixed issue with deleting multiple resources not working
20.35 | June 18 2020 |
- Fixed issue with app remaining in backstage after saving a file
- Fixed issue with not being able to edit in grid after unmounting “Chat with Erix”
- Fixed issue with baseline info not appearing for milestones tasks
- Fixed issue with app crashing when using “Replace” option on Resource Usage view
- Fixed issue with “Delete” key not working after inserting a subproject
- Fixed issue with setting Board status to "Done" does not change %Complete to 100%
- Fixed issue with app crashing when typing an exception in “Change Working Time” dialog
- Fixed issue with app crashing when typing an resource in “Assign Resource” dialog
- Fixed issue with not being able to set units value in Assign Resource dialog
- Fixed issue with app crashing when typing in “Move Project” dialog
- Fixed issue with customize Timescale being enabled in views without timescale
- Fixed issue with date doesn’t change when using “W5/4” format
20.28 | May 20 2020 |
- Fixed issue with Label value not being saved when pressing “OK” in the Timescale dialog
- Fixed issue with dropdowns not being correctly updated when the “Show” field is changed in Timescale dialog
- Fixed issue with app crashing after pressing “Delete” multiple times
20.22 | April 07 2020 |
- Fixed issue with file not saving with Autofilter applied on a certain view
- Fixed issue with saving Organization Template should redirect us to Save As option
- Fixed issue with Organization Template opening slowly and not showing a loading icon
- Fixed issue with Delete key not working
- Fixed issue with error appearing when leaving an empty space after typing an URL
- Fixed issue with resource name not being updated when the cursor remains in resource name cell
- Fixed issue with Get Started dialog not appearing when selecting save as One Drive option
- Fixed Issue with app not remaining in backstage after closing “Expired Subscription” dialog
- Fixed issue with Timescale bottom tier not visible on a particular file
- Fixed issue with New Business Plan template crashing on export to XML option
20.8 | February 17 2020 |
- Fixed issue with setting Std. Rate and Per Use Cost not working on Japanese language
- Fixed issue with Team Members not being displayed in resource control in Task Info
- Fixed issue with Assign Team Members/Resource option should be disabled for task 0
- Fixed issue with start date not changing in grid
- Fixed issue with app crashing on exporting reports to XML
- Fixed issue with view being scrolled to the start of the project after Undo/Redo
- Fixed issue with Autofilter icons not being displayed after scrolling left/right in the view
- Fixed issue with app crashing on Upgrade to Business when we aren’t connected to the internet
- Fixed issue with Task Info dialog not being editable in Task Board view
- Fixed issue with error appearing when switching views
- Fixed issue with missing information in Who Does What report
- Fixed issue with different reports in “Custom” dialog vs “Current Activities”
- Fixed filter issues
- Fixed issue with work value not being copied correctly
- Fixed Collaboration issues
- Fixed issue with units being removed when assigning resources from Assign New Team Member
- Fixed issue with app crashing on Cash Flow report - Export to CSV
- Fixed issue with files from cloud file pickers not being displayed in alphabetical order
- Fixed issue with percent complete not always saving after edit
- Fixed issue with tasks being automatically moved to project start date when moved to the left in Gantt
- Fixed issue with date from “Constraint Date” field not changing after changing the “Constraint type to “Ass Soon As Possible” or “As Late as Possible”
- Fixed issue with app crashing when importing an XML Report
- Fixed issues with Export to PDF on Timeline view
19.82 | December 18 2019 |
- Fixed issue with Show Summary Tasks from Options dialog not working
- Fixed issue with adding the same Risk Value doesn’t show attention message
- Fixed issue with saving subprojects not showing the correct save message
Fixed issue with constraint type not saving after changing the tab - Fixed issue with Assign Resource being displayed on Edit menu
- Fixed issue with “Click here for more info” not working after asking Erix a question
- Fixed issue with app crashing on Indent/Outdent on Task 0
- Fixed issue with app not recognizing the manually estimated tasks
- Fixed issue with Subscription Expired dialog not appearing when signing in with Expired subscription
- Fixed issue with opening templates from Recent list throwing an error;
19.76 | November 19 2019 |
- Fixed issue Network Diagram tasks not being drawn correctly because Active property is null
- Fixed issue with Header/Footer height being bigger than paper size causing "Not enough memory for print" message to appear
- Fixed issue with wrong view size in Collaboration mode with Erix
- Fixed issue with “Display project summaries only” isn’t restored to its last value in Dashboard dialog
- Fixed issue with App crashing in Dashboard dialog
- Fixed issue with app crashing when pressing on OK in Options dialog
19.61 | October 12 2019 |
- Fixed issue with Project Libre format and not being able to open mpp files after app update
- Fixed issue with Critical path being disabled on Tracking Gantt view
- Fixed issue with Go to- empty fields – not showing any error
- Fixed issue with subprojects being enabled on some views
- Fixed issue with delay field not supported on Overallocated Resources report
- Fixed issue with app crashing when opening in preview the Report Overallocated resources
- Fixed issue with work values from Resource Usage report being different than in MSP
- Fixed issue with reset button in Sort by dialog not working
- Fixed issue with work values from Task Usage report being different than in MSP
- Fixed issue with work units from Task Usage report not being always displayed
- Fixed issue with delay field not supported on Who Does What report
- Fixed issue with app not starting on OS<10.14 version lower than Mojave
- Fixed issue with Gridlines, Progress Lines and Layout buttons not being enabled on Tracking Gantt view
- Fixed issue with Options button in Change working time dialog not being internationalized
- Fixed issue with tasks not being displayed on Who Does What report
- Fixed issue with print blank pages should be disabled on some views
- Fixed issue with not being able to open files from One Drive for Business
- Fixed issue with export to image being disabled on Task Board view
- Fixed issue with dropdown from Select Sprint filter not being available
- Fixed issue with app crashing when adding 2 columns with the same name on Task Board view
- Fixed issue with Signing out from Google Drive not working
- Fixed issue with print blank pages should be disabled on print preview
- Fixed issue with not being able to save a file in Google Drive if it was open more than 1 hour
- Fixed compatibility issue with MSP on non-English project files
- Fixed issue with Excel fields being mapped to the same column and not being able to import the file
19.47 | August 15 2019 |
- Fixed issue with different dates that appear on Burndown and S-Curve reports
- Fixed issue with app crashing on save as PDF and Export to CSV on Burndown and S-curve Reports
- Fixed issue with tasks appearing wrong on print preview on reports
- Fixed issue with text being overlapped in print preview for custom reports
- Fixed issue with new created report doesn’t appear after the file is saved in MS Project
- Fixed issue with error appearing on custom reports
- Fixed issue with custom reports labels not being internationalized
- Fixed issue with Drive365 not being available in “browse” dropdown
- Fixed issue with labels not being internationalized in Dashboard dialog
- Fixed issue with dashboard files saved in Drive 365 not being displayed
- Fixed issue with Esc key not working on some dialogs
- Fixed issue with Enter not working on some dialogs
- Fixed issue with cursor remaining in loading behavior after we disconnect from the internet
- Fixed issue with internet connection message appearing on wrong files
- Fixed issue with app crashing on reports
- Fixed issue with text appearing overlapped in print preview on non-en languages
- Fixed issue with resource group dialog should be removed from custom reports
- Fixed issue with dashboard files not being displayed in backstage -> Drive 365
- Fixed issue with error appearing on chart preview when creating a report
- Fixed issue with dialog not appearing on To Do List- customize
- Fixed issue with app crashing on files saved on Sharepoint
- Fixed issue with app crashing on XML files – dashboard
- Fixed issue with app crashing on Export to CSV for usage reports
19.42 | July 7 2019 |
- Fixed issue with assigning resources
- Fixed issue with copy resource not working fine
- Fixed issue with resource appearing with wrong ID
- Fixed issue with new inserted resources appear wrong after save
- Fixed issue with Notes column not being editable in Resource Sheet
- Fixed issue with overallocation
- Fixed issue with overallocated field not displaying any value in Gantt Chart
- Fixed issue with Undo/Redo not working when we hide a column
- Fixed issue with notes appearing with “…” in Notes column
- Fixed issue with duration entered in hours/days/minutes/weeks changes only for summary tasks
- Fixed issue with save message not appearing after pressing “Close”
- Fixed issue with start date not changing in grid
- Fixed issue with file saved on Web not appearing in Drive 365 on Mac
- Fixed issue with opening a file from local device using hyperlink not working
- Fixed issue with Risk field not being disabled when Enable Risk Management System checkbox wasn’t checked
- Fixed issue with cursor remaining in loading behaviour in Dashboard dialog
- Fixed issue with text in dashboard dialog not being entirely visible
19.40 | June 12 2019 |
- Fixed issue with Agile pop-ups aren’t disappearing
- Fixed issue with Agile being displayed on all views except Gantt Chart view
- Fixed issue with Name not entirely visible on Manage Sprints dialog
- Fixed issue with Manage Sprints dialog not working
- Fixed issue with app closes when a column was renamed
- Fixed issue with file wasn’t saving with the changes made on Backlog Board
- Fixed issue with Agile lables not being internationalized
- Fixed issue with Current Sprint dialog appearing on Current Sprint Sheet and Current Sprint
- Fixed issue with app crashing on French language
- Fixed issue with filter being enable on Scum/Backlog
- Fixed issue with clicking on Planning/Backlog opens the Sheet view not the Board one
- Fixed issue with app crashing on inserting recurring task before a project summary task
- Fixed issue with Standard Rate and Per Use Cost not being editable in Resource Information dialog
- Fixed issue with inserting recurring tasks on first row not working
- Fixed issue with default assignment owner should be removed from Resource Information dialog
- Fixed issue with Per Use Cost not working on Resource Information dialog
- Fixed issue with setting Std Rate and Cost/Use not working on non-EN languages
- Fixed issue with Risk View not being displayed on dropdown
- Fixed issue with new created view should be autoselected in More Views dialog
- Fixed issue with new created view doesn’t appear in Organizer
- Fixed issue with new created view not being displayed in dropdown
- Fixed issue with app crashing on new created view
- Fixed issue with labels not being internationalized in View definition dialog
- Fixed issue with error appearing when clicking on More Views from dropdown on non-EN languages
- Fixed issue with Peak Units and Overallocation values different than MSP
- Fixed issue with sprint not appearing on Current Sprint Sheet
19.33 | May 13 2019 |
- Fixed issue with base calendar missing after deleting resource and trying to save the file
- Fixed issue with Recent files from Options dialog not working
- Fixed issue with Username should be removed from Options dialog
- Fixed issue with dialogs not editable after signing in with Complete Editor/Business subscription in store app
- Fixed issue with alert shouldn’t appear when we set start date for manually tasks
- Fixed issue with error appearing when we set years 1948 and 2149
- Fixed issue with check spelling should be disabled by default
- Fixed issue with error appearing at multiple date formats
19.26 | April 16 2019 |
- Fixed issue with file name in cloud file pickers not fully visible
- Fixed issue with app crashing on grid actions
- Fixed print issues
- Fixed issue with missing options from Outline tab
- Fixed issue with collaboration timeout appearing with 0 minutes
- Fixed issue with active fields not being editable
- Fixed collaboration timeout box issue
- Fixed issue with Custom Fields on Resource Sheet
- Fixed issue with Change Working time app crashing
- Fixed issue with app crashing on inserting column in German language
- Fixed issue with expired subscription
- Fixed Timescale issue
- Fixed issue with legend that doesn’t fit in ROC16 K paper size
- Fixed issue with baseline columns mix-up
- Fixed issue with edit task mode, manual start/finish/duration, WBS for project task
- Fixed issue with working days shouldn’t be displayed
- Fixed issue with Task Usage crashing
- Fixed issue with internationalized working days don’t fit in dialog
- Fixed issue with opening from Recent files
- Fixed issue with Undo/Redo for dialog editing
- Fixed issue for XML file from clouds opening with inactive tasks
- Fixed issue with Undo/Redo in Task Info dialog
- Fixed issue with edit mode remaining after assigning resource in resource column
- Fixed issue with tasks can’t be checked as Inactive in Task Info dialog
- Fixed issue with Inactive tasks not supported in Collaborative mode
19.21 | March 18 2019 |
- Remove double line in ribbon
- Solved issue with calculations not being correct in Cash Flow Report
- Solved issue with reports not being drawn correctly when orientation is changed to landscape
- Solved issue with Save Alert not always appearing after changes in the project
- Solved issue with Saving files on Box
- Solved issue with timer value not decreasing in collaboration mode on Mojave
- Solved issue with users being able to open files in collaboration mode without being signed in inside app
19.16 | February 18 2019 |
- Implement request to enhance grid editing and navigation using arrow keys
19.13 | January 31 2019 |
- Fix issue support .mpt files
- Fix issue with F2 keyword
18.61 | December 4 2018 |
- Solved issue with open file
- Solved issue on rtf notes
18.55 | October 19 2018 |
- Solved issue with open file on double click
- Fix issue about predecessors and resources tables in task info that aren't visible in Mojave
18.51 | October 3 2018 |
- Solved issue with OS X Mojave
- Fix Export to Image not working in Team Planner view
- Solved issue with fields containing percent symbol ('%') not working properly when the language is changed to French
18.40 | August 30 2018 |
- Solved issue with notes text view scrolling to left when text is on multiple lines
- Solved issue with app crashing
- Implement request Master Project and subprojects feature
- Solved issue with %complete on milestones
- Solved issue about Copy/Paste on predecessors
18.25 | May 11 2018 |
- Fix for Outline Number column that appears empty
- Fix print scaling issue
- Fix issue synchronizing task with gridlines
- Fix for unassigned tasks in Team Planner view
18.21 | April 20 2018 |
- Fix for editing Contact field
- Fix for saving MPP file
18.19 | March 23 2018 |
- Fix issue with app crashing when the user deletes the content of the 'Field Name' comboBox in the 'Insert Column' dialog and then presses OK
18.16 | March 8 2018 |
- Fix for open/save XML file
- Fix for work breakdown structure