FAQs How do I...?

Browse by Category

FAQ › Category: How do I...?
Can I edit a local project if someone else is making changes to it?
Question Link
Answer
If somebody has already opened the project file in your local network either in Project Plan 365 for PC / Server, or in Microsoft Project, you will be informed that the file is in use and locked for editing and you will be offered the possibility of opening it in read-only mode. This means that you can make changes to the project, but cannot overwrite the original file and will have to save a copy instead.
How do I “Export as PDF” the Bubble View?
Question Link
Answer
We are sorry but the “Export as PDF” option isn’t available for Bubble View.
How do I print the Bubble View?
Question Link
Answer
We are sorry, but at this point the “Print” option isn’t available for Bubble View.
How do I “Export to Image” the Bubble View?
Question Link
Answer
In order to “Export to Image” the Bubble view, go to the File menu – Import/Export – Export and select “Export to Image” option. Type the name of the file and press “Save”. You can also use the “Export to Image” option from the “Share” menu. Go to the “Share” menu and click on “Export” option. Select “Export to Image” from the options available, type the name of the file and press “Save”.

How can I save the Bubble View as the default view?
Question Link
Answer
We are sorry, but at this point the Bubble view can’t be saved as the default view.
How to modify a formatting rule?
Question Link
Answer
In order to modify a formatting rule, change the Task Field, test and value for an existing formatting rule and then click on “Apply” button for the changes to take effect.
How to remove a formatting rule?
Question Link
Answer
In order to delete a rule, simply click the X button corresponding to the rule. After you confirmed the action, click Apply to save the changes.
What are the supported tests for the Formatting rules?
Question Link
Answer
The supported tests for the Formatting rules are the following:

1. is equal to
2. is not equal to
3. is greater than
4. is less than
5. is greater than or equal to
6. is less than or equal to
7. is between (2 values)
8. begins with
9. ends with
10. contains



 
How can I add a new general rule?
Question Link
Answer
To add a new general rule, open the Formatting Options dialog and make sure the General tab is selected. After that, click on the “New Rule” button. You can select the Task Field, test and provide the values for test. The new rule will apply for all tasks that pass the configured test.
What is the difference between “General rules” and “By Group” rules?
Question Link
Answer
The difference between “General rules” and “By Group” rules is that the “General” formatting rules are applied for all task bubbles, regardless the group and the “By Group” formatting rules are applied only for the task bubbles from the selected group.
Are the grouping formatting rules applied for a specific group?
Question Link
Answer
The “By Group” formatting rules are only applied for task bubbles from the specific group.
Are the general formatting rules applied for all groups?
Question Link
Answer
The general formatting rules are applied for all task bubbles, regardless the group.
How do I change the color of a predefined group?
Question Link
Answer
In order to change the color of a predefined group, select the group from the right-upper side of the view, click on “Formatting” option and then select “By Group” tab. From “Background”, change the color for an existing rule and then press “Apply”.
How can I track a specific task?
Question Link
Answer
In order to track a specific task, right click on the task bubble and select the “Assign color” option. In the “Assign Color” dialog, select the desired color and click on “Assign” button. This will create a new General formatting rule for the Unique Id of the selected task. You can always modify or remove this formatting rule later.

What does the “Resources” group mean?
Question Link
Answer
The “Resources” group shows the tasks grouped by the resource assigned to the task. Each group represents a resource and the subtasks are tasks to which the resource is assigned. If no resource is assigned to a task, it goes into the Unassigned group.

What does the “Agile (Board Status)” group mean?
Question Link
Answer
The “Agile (Board Status)” group shows tasks grouped by Board Status. The default groups are:
  • Backlog
  • Next up
  • In progress
  • Done
What does the “Risk” group mean?
Question Link
Answer
The “Risk” group shows tasks grouped by their Risk Field value. Each group represents a distinct risk level. By default, there are three risk levels:
  • low
  • medium
  • high
You can customize this through our Risk Management System.
What does the “Milestones” group mean?
Question Link
Answer
This grouping shows all milestones in a single group.
What does the “Progress” group mean?
Question Link
Answer
The “Progress” group shows the tasks grouped based on % complete as following:
  • Not Started – 0%
  • In Progress – 1% to 99%
  • Done – 100%
What does the “Summary” group mean?
Question Link
Answer
The “Summary” group shows the WBS of your project. You can use this grouping to visualize the WBS of your project and provide color-code for different tasks / field values (using the Formatting Options). This grouping supports Project → Outline options.
What does the “Status” group mean?
Question Link
Answer
The “Status” group is the default grouping for the Bubble View. It shows the tasks in your project grouped by their Task Status field:
  • Late
  • On Schedule
  • Complete
  • Future Tasks
How do I assign resources to a task in Bubble View?
Question Link
Answer
In order to assign resources to a task in Bubble View, double click on the desired task bubble or right click on it to open/select Task Information dialog. After that, go to the Resources tab, type the name of the resource and then click on “OK” button inside the Task Information dialog for the changes to take effect.
How do I rename a task in Bubble View?
Question Link
Answer
In order to rename a task in Bubble View, double click on the desired task bubble or right click on it to open/select the Task Information dialog. Type the new name of the task and press on “Ok” button inside the Task Information dialog for the changes to take effect.
How can I open the Task Information dialog for a task/group?
Question Link
Answer
In order to open the Task Information dialog for a task, please double click on the desired bubble task. Also, you can open the Task Information dialog by right clicking on a task bubble and selecting Task Information option. The Task Information dialog isn’t available for Group bubbles.
What are the information about a task/group that I can find in Information Card?
Question Link
Answer
In the information card you can find the following elements about a task/group:

1. Task / Group Name
2. Task / Group Duration
3. Task / Group Start Date
4. Task / Group Finish Date
5. Task / Group Cost
6. Task / Group Progress (% Complete)
7. Task Status (Late / On Schedule / Complete / Future Task)
8. Summary tag (only for summary tasks)
Contact
Chat